The required detention volume is based on the different in runoff volume generated during the pre-developed and post-developed condition for the 100 year, 24 hour event. Participants wanting to purchase regional detention capacity should submit a stormwater report, signed and dated by an engineer licensed in Washington state, or other licensed professionals if appropriate.